Copy from reference
Not Lite
Copy from reference action performs the same process as the Copy from reference command.
This macro step requires reference points. If running on loaded points, read reference points before using this step. If running on project, enable Load reference points -option when starting the execution.
Return value: Number of points that were effected by the process or -1 if the process failed.